Steam Condensate Piping Design
Steam Condensate Piping Design. 15.4).any steam lines rising in the direction of flow should slope at not less. This pipe must be sized for pressure drop at the rated flow and room for water flow (condensate), air, and flash steam.

I'm going to sparge condensate into an atmosferic tank. Because condensate is on the. Steam and condensate piping systems below grade 23 22 13.1 7.
Conversely, The Table Can Be Used To Determine Btu Output If Steam Condensing Rate Is Known.
232200 steam and condensate piping and pump systems revised 12/20/2013 page 1 of 7 232100. Sample guidelines for drip leg dimensions. The piping used to transport condensate is typically called “condensate recovery piping” or “condensate return piping”.
In The Application Portion Of This Section, There Are Several References To The Use Of The Steam Table.
Distribution piping complying with thermal energy cooperative (teco) requirements is Pay attention to drip leg (drain pocket) configuration. One is to increase the diameter of the drain line, which is still usually impractical;
In The Photo To The Right, There Is A Steam Trap Off The Steam Main, And Condensate Is Returned To The To The Top Of The Condensate Pipe.
I'm going to sparge condensate into an atmosferic tank. Compute the amount of steam that will be condensed by any heating unit of known btu output. I designed my piping based on wet steam (condensate in the line flashes)with a max speed of 20 m/s.
Circulate A Chemical Cleaner In Steam And Condensate Piping System To Remove Mill Scale, Grease, Oil And Silt.
However the surface area of all the holes of the sparger is smaller than the surface area of the pipe. Condensate pipe velocities (liquid and flash steam) must be lower than 4500 feet per minute to prevent system water hammer and other damaging effects. Section includes underground piping outside the building for distribution of steam and condensate.
The Other Is Much Simpler, To Fit The Correct Trap For This Type Of Application;
Properly remove air and condensate at end of steam line. In the dryer section the moisture is evaporated as the sheet is pressed between a fabric and the hot drying cylinder. Condensate terminal points should contain an air break (2” or 2 pipe diameters, whichever is greater) between the end of the pipe and the drain, floor or grade.